Okay so in this run. What I will need to do is to cast each half of the arm then I need to demould the posterior facing arm half to drill holes and cut out the shapes for the inserts. This is that process. It will take about 3 days.
Subscribe to:
Post Comments (Atom)
Resin fibreglass Master arm first run
Okay so in this run. What I will need to do is to cast each half of the arm then I need to demould the posterior facing arm half to drill h...
-
Okay so in this run. What I will need to do is to cast each half of the arm then I need to demould the posterior facing arm half to drill h...
-
For whatever reason this is not allowing me to upload screenshots of the good copies of t` ` ` `` `` hese doc...
-
Soft Mould of the master is in production and my intramuscular injection pad and suture pad moulds. Here is a bit of the process. I am cast...
No comments:
Post a Comment